Showing posts with label Capacity Planning. Show all posts
Showing posts with label Capacity Planning. Show all posts

Thursday, November 22, 2007

Does Maths play a vital role in Performance Testing

Most of you must be puzzled to know Maths (Statistics) plays a vital role in Performance Testing. Yes, we must accept the fact that performance tester should use mathematical knowledge to conduct effective performance testing activity.


Slowly , (i mean it took a long time for us to understand and appreciate that mathematical knowledge is required for Performance testing) we started appreciating the fact that - a new strategical move is there in Performance testing which is nothing but the use of more & more analytical approaches to model the system more realistically and to predict the system performance for varying higher loads.


I would like to share this paper - A strategical move towards Analytical modelling with you. This paper will help you to appreciate the importance and relevance of analytical approaches for effective performance engineering activities. I prepared this paper for STEPIN 2008.

Look for the entire article here...

Saturday, November 10, 2007

Capacity Planning - An ITIL Way

I prepared a paper for QAI - ITSM conference. Though it was not selected for the conference, just thought of sharing that paper with you.

This paper will provide you the glimpse of what is ITIL , what is ITSM , What is Capacity Planning, who to assure 100% system availability through effective capacity planning and how to do effective Capacity Planning.

Look for the entire article here...

Hope it helps!!!! Happy learning

Wednesday, September 12, 2007

What is Capacity Planning in a bird's eye view?

Though the awareness about the Performance Engineering is slowly increasing, still people are thinking that Capacity planning as an alternative to performance testing or sometimes planning for the server capacities before baselining the software performance.

Capacity Planning helps in identifying the specific point of time in future through prediction when the system saturation is going to occur and provides the most cost-effective way of delaying system saturation as long as possible.

Capacity Planners help in identifying the system's saturation point. When and why the saturation would occur and which are the best cost-effective alternatives for avoiding the saturation.

Before looking at the underlying server hardware, we need to first look at the software performance and perform tuning activities to get better performance. Then we need to think about the server capacities.End of the day, its the server's workload pattern which consumes the system resources. Identify the system workload and analyze the system resource usage for the typical workload expected on the server. Based on this, arrive at the capacity baseline on the current server hardware.

Based on the business forecasts, do a prediction on how much increase would be expected in the workload due to the business forecast and identify the required server resources to support the demand. Thus Capacity Forecast is done for the forecasted load expected by the business.